Aquifer Test
In order to obtain subdivision approval, it is necessary to drill 3 wells & measure the drawdown of the cones of depression in relation to neighbor wells.
In order to obtain subdivision approval, it is necessary to drill 3 wells & measure the drawdown of the cones of depression in relation to neighbor wells.
Advanced treatment system hidden within retaining wall for future strategic shrub placement.
The DEC issued a compliance order for surfacing sewage effluent. NorthRim Engineering fast-tracked a new design-build system.
Andrew Airways is situated at the Kodiak Airport. The DEC required two underground fuel storage tanks be decommissioned. A work plan was developed, the two 25,000 gallon fuel tanks were removed, & contaminated soil was removed.
Advanced (Advantex) wastewater system designed & constructed for lodge. Due to the superior effluent treatment, DEC allowed discharge to beach gravels.
Public water system inspections as required by EPA/DEC. Certified Sanitary Surveyor. Completed throughout Alaska, from large systems like the Municipality of Anchorage to small systems.
Soil tests, aquifer studies, drainage modeling as requirements for subdivision approval.
Our technicians hold the appropriate & current certification.